Loring Data Center / A US data centre for Canadian companies

A US data centre for Canadian companies

A United States footprint 30 minutes from the New Brunswick border, with power available on an existing will-serve and no provincial authorization queue.

Request capacityHow the cooling works
Aerial view of the former Loring Air Force Base with the twin runways and Building 7230 marked at the south end of the flight line
The former Loring Air Force Base, about 30 minutes from the New Brunswick border.
30 minfrom the New Brunswick border
24 MWmore under a signed Versant Power will-serve
Moncton, Halifaxfibre routes east, plus south to Boston
Hydropower, largely from New Brunswick

Who it fits

  • Atlantic Canada and Quebec firms selling into the USHost US customer workloads on US soil, a short drive from the border, without building a US facility.
  • Defence and aerospace suppliersOne environment for firms aligning to US requirements such as NIST SP 800-171 alongside Canadian controls.
  • Firms waiting on power at homeNew data centre load in Quebec and New Brunswick now waits on provincial authorization and a long utility queue. Loring's power sits on Versant Power's existing will-serve.

Who it does not fit

  • Canadian public bodies and health authorities are generally required to keep personal information in Canada, so Loring is not the right home for those workloads. Loring will work through cross-border data terms with your counsel.

Why Loring instead of a metro colocation hall

  • Next-generation coolingLiquidCool Solutions chassis immersion: no fans, no chillers, no water. The compute of 115 air-cooled racks fits in 24.
  • Close to homeAbout 30 minutes from the border, 25 minutes from Presque Isle International Airport, with fibre east to Moncton and Halifax.
  • Familiar powerSupplied largely from New Brunswick hydroelectric generation.
  • Simple termsOne monthly rate per kilowatt of committed power, three to five year terms.

Questions

Why would a Canadian company host at Loring?

Power and time to connect. Loring sits on Versant Power's existing will-serve, 30 minutes from the border, with fibre east to Moncton and Halifax, while new data centre load in Quebec and New Brunswick waits on provincial authorization and a utility queue.

Can Canadian public bodies use Loring?

Generally no. Canadian public bodies and health authorities are usually required to keep personal information in Canada.

How is capacity priced?

Per kilowatt of committed power per month under a colocation services agreement, with power and connectivity bundled or metered, on three to five year terms.

Tell us what you run.

Email info@loringdc.com or call (207) 300-5046. The email opens with six questions filled in. The power figure and the date matter most.

Or use the capacity form. Site visits by appointment at Building 7230, 89 Kansas Road, Limestone, Maine.